Skip to main content

Mico24

MICO24 for wastewater treatment plants and WWTPs

Control the process, critical equipment, and energy consumption of the wastewater treatment plant in real time to reduce incidents and anticipate deviations.

Problem

In a WWTP, small process deviations can lead to extra costs, operational incidents, or environmental risk. Pumps, blowers, aeration, sludge, motors, and process parameters must operate within stable margins so that the plant maintains performance.

When an incident is detected late, the cost is no longer only mechanical. It can also affect energy consumption, treatment quality, maintenance planning, and the ability to respond to critical situations.

MICO24 solution

MICO24 makes it possible to monitor wastewater treatment plant equipment and variables in real time, centralize information, and generate alarms for deviations. This information facilitates more continuous operational control and helps prioritize actions before an anomaly becomes a stoppage or a process incident.

The platform is especially useful for monitoring motors, pumps, blowers, electricity consumption, treatment parameters, and alerts associated with the risk of discharge or operation outside the range.

Applications

Benefits

Success story

Let’s review where MICO24 can help you control process, energy, alarms, and critical equipment.

Take the leap into industry 4.0 with MICO24

The savings generated by MICO24 by preventing an unplanned stop are:
000-000/year

*This saving does not include the productivity benefits derived from the reduction of unplanned stops, so the actual savings are higher than what the calculator shows.

**MICO24 specifies that this calculation is indicative and illustrative, and in no case should it be considered a certain promise.

Your annual savings with MICO24 is:
000-000/year

*This saving does not include the productivity benefits derived from the reduction of unplanned stops, so the actual savings are higher than what the calculator shows.

**MICO24 specifies that this calculation is indicative and illustrative, and in no case should it be considered a certain promise.